What if slab to lock-up took six days, not months?
Featuring Resident Builder Peter Wolfkamp, Flexipanel and Frankhouse, Episode 1 of our J-Frame series follows the timber from the factory through to installation on site and shows what precision manufacturing means when it comes time to build.
J-Frame is manufactured to tight tolerances, helping the team go from slab to lock-up in just six days, with no wall straightening required on site. Watch Six Days to Lock-Up to see what happens when precision in the factory meets efficiency on site.